Bush Creek SPS largeMRA designed this 28-MGD pumping station, including surveying, subsurface exploration, geotechnical evaluation, environmental permitting, feasibility study, preliminary design, hydraulic evaluation, civil, mechanical, structural, electrical, architectural designs, and services during construction. This sewage pumping station supplies approximately 60% of the County’s service area. This project was a complete replacement for the existing station and incorporated a design to interface operation switchover while using the existing force main without interruption of operation.