Foster Branch SPS 1000pxMRA provided design and construction phase services for a 2.8-MGD built-in-place station with three non-clog submersible dry pit pumps with VFD control, 6,000 LF of 12-inch force main, and 165 LF of gravity sewer. The station is located within the Chesapeake Bay Critical Area. A Critical Area report and mitigation plan was prepared to acquire approval. The new station allows for abandonment of four existing stations.