MRA provided planning and design of the 2.0-million-gallon elevated water storage tank with two 2,330 gpm Zone 2 booster pumps mounted in the base of the fluted column.
Morris & Ritchie Associates, Inc. > Civil / Site / Utility Engineering > Water Engineering > Abingdon Road Water Tank and Booster Station, Harford County, MD